Haringey gets a mention – Mayor’s responses to questions on cycling tabled at December 2013 session of Mayor’s Question Time
The full document can be found here
Electric bike trial in Haringey (1)
Question No: 2013/4890
Joanne McCartney
Following on from MQ 2013/4214, when do you expect to have the details of the length of trial, cost and potential take up for the e-bike trial in Haringey?
Written response from the Mayor
The results from the feasibility study are expected in summer 2014.
Electric bike trial in Haringey (2)
Question No: 2013/4891
Joanne McCartney
Following on from MQ 2013/4216, when will you make your decision on where the 30 e-bikes to the Metropolitan Police Service (MPS) will be deployed?
Written response from the Mayor
The MPS will provide a full timetable and pilot plan in January once expressions of interest from E-bike suppliers have been received. The pilot will start soon after the MPS receives the E-Bikes.
Quietways in Haringey
Question No: 2013/4894
Joanne McCartney
When will the Quietways be implemented in Haringey? How long will you monitor them to ensure they are safe and to measure the uptake?
Written response from the Mayor
The Quietways are a ten year programme offering a high-quality network of guided routes on back streets, through parks and along canal towpaths. Construction on the first routes will begin in 2014 and the locations of these routes will be announced in the New Year.
TfL is building on the existing pan-London cycling monitoring programme which will cover the infrastructure delivered as part of my Cycling Vision. The results of this monitoring will be used to develop and improve each Cycling Vision programme to ensure they are contributing effectively to my overall cycling strategy and the 5 per cent cycling mode share target in my transport strategy.
You must be logged in to post a comment.