Consultations, News

CS1 response

Last chance to have your say on Haringey’s Cycle Superhighway

Here’s our proposed response to Transport for London’s Cycle Superhighway route 1 (CS1) consultation which ends on Sunday.

The response below is a draft on behalf of Haringey Cycling Campaign and London Cycling Campaign  – there may be minor edits after the London Cycling Campaign IRG (Infrastructure Review Group) meeting on Thursday 26th March.

B9_5SuDIgAAHHxY
Proposed 2-way cycle track on the western pavement of the High Road between West Green Road and Town Hall Approach, lanes separated by trees (which already exist)

 

We feel there are many problems with the present proposals.

TfL are already reconsidering the South section of the route through Haringey, following our objections to the St Ann’s Road alignment.

Hopefully there will also be a rethink on the centre section from South Tottenham station, past Seven Sisters Road to Philip Lane, which includes sections of shared space on the pavement outside a busy Seven Sisters underground station entrance and High Road bus stop – where local cyclists have recently been stopped from cycling by MPS Haringey (although the acting Inspector has since apologised by email and sent a memo to all neighbourhood team reminding officers what a shared use space sign looks like).

Please let TfL know your views! The deadline for responses is Sunday the 29th March.

CS1 consultation event in Marcus Garvey library
CS1 consultation event in Marcus Garvey library

 

The TfL consultation documents can be found at  https://consultations.tfl.gov.uk/cycling/cs1

 

Our full draft response can be read here – with section by section notes: CS1 notes LCC.HCC

Our thoughts and sketch for a protected right turn at Philip Lane in to Town Hall Approach can be found here: Philip Lane Protected Right

A very well written response to the proposals by Tottenham Civic Society can be read here: Tottenham Civic Society – CS1

Here's how busy the current shared space is - even busier when students are arriving and leaving College of North East London. The large tree planter CANNOT be removed or reduced so all pedestrians and cyclists using CS1's proposed route will be funnelled to the right of this tree, where everyone is walking.
Here’s how busy the current shared space is – even busier when students are arriving and leaving College of North East London. The large tree planter CANNOT be removed or reduced so all pedestrians and cyclists using CS1’s proposed route will be funnelled to the right of this tree, where everyone is walking.
News

Notes from East of borough ride with Councillors & Officers

Following our successful September ride around the central third of the borough (well, Wood Green, Turnpike Lane, Harringay) with Cllr Toni Mallet (the borough cycling champion) and Cllr Stuart Macnamara (our Cabinet Member for the Environment) we held our second ride, heading east on 17th October.

We were joined by 2 Project Engineers who work in the Sustainable Transport team at Haringey Council – the engineers and Cllr Macnamara borrowing council pool bikes – although Stuart has now officially sign up to keep his pool bike long term!

To get an idea of where we covered, here’s a rough ride route:

Chestnuts Park, North Grove, Roslyn Road, Town Hall Approach, Broad Lane, Ashley Road, Park View Road barriers, Watermead Way, Northumberland park, Park Lane, Bruce Castle Park, Risley Avenue.

We visited a number of sites we identified as Haringey Space for Cycling ward asks – including the infamous Park View Road barrier. 

Here’s the notes from the ride, which we’ve presented to all present for reference. 

 

B0JBuvDIYAAWE64

 

B0KfZVwIQAARdn7

News

Tottenham Hale – meeting TfL & local Councillors 4th November

On Tuesday 4th November, we’re joining a meeting between Transport for London representatives, local Councillors and residents to discuss the problems that still need to be ‘ironed out’ now that the Tottenham Hale Gyratory removal scheme is ‘complete’*

WE NEED YOUR INPUT

READ THE FEEDBACK WE’VE RECEIVED SO FAR HERE

We’ve heard from a lot of people via Twitter, Facebook, email and face to face who have complaints about the new layout, often that it is ‘worse than before’ or ‘more difficult to get north to south’.

We agree, but we need your comments to present during this meeting.

This is our one chance to feedback to TfL. Every comment counts because ‘every journey matters’ !

Email your comments to us in the following format:

To: Haringey@lcc.org.uk

Subject: Tottenham Hale – meeting 4th November

Content: A brief description of your problem, followed by location if specific.

 

We’ll collate all comments in to one document, which we’ll present at the meeting on 4th November. We’ll make the list of all comments public on our website too.

*although Thames Water are still due to dig up some sections which is why there are still temporary crossings on Ferry Lane.

 

TfL Tottenham Hale

Events

Our next ride around Haringey – EAST

We’ll be riding around the borough with Cllr MacNamara and Cllr Mallett again on Friday 17th October, and this time, we’re heading EAST.

Think  Chestnuts, Downhills and Lordship – The Roundway, Bruce Castle area (pictured on a sunny day!) Northumberland Park, Tottenham Hale.

We’ve compiled a list of locations to visit – if you have anything to add, please contact us by 12pm on Friday. 

Watch out for a report after the ride…. and for details of our final ride when we’ll cover the west of the borough.

Cycling Tour de Haringey – EAST

Friday 17th October 2014

Number of visit

Location

Issue

22

Forster Road/junction of Winchelsea Road

Should be two way for cycling (where the bridge is)

21

Entrance to Napier Road on Philip Lane

This IS two way for cycles – car parking space needs to be removed close to entrance to allow space for cycles to enter

20

Lawrence Road

road closed – very wide and useful road with little cycling provision.

1

North Grove/ Hermitage Road

GOOD example of HCC advice being followed, allowing cycle access in to North Grove!

3

Downhills Park

Good new entrances – wider with just bollards

4

The Roundway/Risley Avenue junction

Blind bend. Toucan Crossing required – or new style crossing – see LCDS.

5

The Roundway/All Hallows Road

Very wide crossing of The Roundway – add an Island?

6

Church Road – under railway

Emergency access barrier on road – not space to cycle around the side of bollards

7

Park Lane

Same as above

8

Marigold Road/Watermead Way

Poorly maintained cycle infrastructure – lane on pavement

9

Park View Road barrier and tunnel

Tunnel regularly flooded. Barrier obstruction!

10

Ashley Road barrier

Same as above

11

Hale Road toucan crossing

Timing problem

2

Avenue Road/end of Roslyn Road and Sleaford Road

Short stretch should become 2 way for cycles

Around Tottenham Hale – the former Gyratory

13

Monument Way toucan crossings

Refuge unsuitable for cycles and peds

18

High Road, West Green to j/w Town Hall Approach

Unsegregated shared footway – not suitable for amount of ped traffic and paving slab signage not adequate

16

Pavement north of War Memorial at Town Hall Approach

New lit shared use signage, pavement narrows

17

ASL on Town Hall approach/unmade surface

Not enough space to enter ASL/road and unmade area next to shared use pavement – this is responsibility of LBH

15

High Road/ Town Hall Approach area

Crossing not in desire line

14

High Road/Philip Lane junction

Difficult right turn – not signalized – no ped crossing light on Philip Lane

19

Broad Lane/ Markfield Road junction

Pocket required to enable right turn in to Markfield Road.

12

Within former Gyratory

All roads should be two-way for cycles – difficult to navigate through

Events

People on bikes needed for 5 minutes on Friday!

We need some people on bikes who can spare 5 minutes on Friday 17th October, at 10am in Tottenham, N17.

We’re meeting a local Councillor and Haringey Council representatives to discuss removal of the Park View Road and Ashley Road barriers, which prevent access to Lea Valley Park.

If you can make it, please email haringeycyclists@gmail.com with ‘Friday 10am’ in the title. 

We’d particularly like to hear from you if you can come along and bring one of the following:

  • Child seat on a bike (with or without child in!)
  • Cargo bike
  • Bike with trailer
  • Bike with ‘dutch’ style high handlebars
  • Bike with front basket
  • Bike with large full panniers
  • Pushchair
  • Wheelchair
  • Shopping trolley

or anything that you’d struggle to get through these barriers….

 

BsPgKO0IAAAHB_CBm581xHIMAAyp-sBmC-n5rIAAEgpw4BamIZDxIMAAAC7W

Events, News

Broad Lane goes 2-way ride

April 27 @ 3:30 pm – 4:30 pm

A ride to celebrate Broad Lane going 2 way for the first time in years. Full event details here.

FREE

Join us on Sunday 27th April to ride the newly two-way Broad Lane, to celebrate the removal of the infamous Tottenham Hale Gyratory system.

It is our very own Day ‘H’ in Haringey. Join us on your bike or trike, and meet some fellow Haringey-ites when we have afternoon tea afterwards.

Meet at 3.30pm at the Markfield Park Cafe , returning to the same point after a short group ride.

The cafe has the red roof in the photo below – see you there!

Markfield Beam Engine Main Image